Education
University of Georgia
Botanic Gardens Center
for Art and Nature
New Construction | 30,000 SF
State-of-the-art facility is the first of its kind to integrate decorative art within a garden setting. Turnkey electrical services.
University of Georgia
Botanic Gardens Center for Art and Nature
New Construction | 30,000 SF
State-of-the-art facility is the first of its kind to integrate decorative art within a garden setting.
Morehouse School of Medicine
Hugh Gloster Building and the
Medical Education Building
Renovation | 47,000 SF
Puzel provided turnkey electrical services; from installation of the 2500-amp, 480-volt in-ground power service to the interior installation of LED lighting, energy conserving lighting controls, IT and AV systems, The LEED-Gold renovation created a new research lab, educational classrooms, and administrative space.
Morehouse School of Medicine
Hugh Gloster Building and the Medical Education Building
Renovation | 47,000 SF
Puzel provided turnkey electrical services; from installation of the 2500-amp, 480-volt in-ground power service to the interior installation of LED lighting, energy conserving lighting controls, IT and AV systems, The LEED-Gold renovation created a new research lab, educational classrooms, and administrative space.
Moving in the Spirit
A Space to Soar
New Construction | 50,000 SF
New two-story building with administrative offices, dance classrooms, dance performance and event gathering area. Turnkey electrical services.
Moving in the Spirit
A Space to Soar
New Construction | 50,000 SF
New two-story building with administrative offices, dance classrooms, dance performance and event gathering area. Turnkey electrical services.
Talley Elementary School
City of Decatur
New Construction | 57,000 SF
Two two-story classroom wings with a courtyard between the west wing and the south side of campus. Included 40,000-square-foot play field, garden, a playground area. Supports 750 students. Turnkey electrical services.
Talley Elementary School
City of Decatur
New Construction | 57,000 SF
Two two-story classroom wings with a courtyard between the west wing and the south side of campus. Included 40,000-square-foot play field, garden, a playground area. Supports 750 students. Turnkey electrical services.
Georgia Institute of Technology
Boggs Chemistry Building Labs
Renovation | 32,000 SF
Two floor renovation spanning 32,000 SF included renovations to instructional chemistry laboratories, academic offices, corridors, chemical storage, and miscellaneous improvements and upgrades to the building’s HVAC system. All construction was completed with the remaining portions of the Boggs Chemistry Building fully occupied and operational.
Georgia Institute of Technology
Boggs Chemistry Building Labs
Renovation | 32,000 SF
Two floor renovation spanning 32,000 SF included renovations to instructional chemistry laboratories, academic offices, corridors, chemical storage, and miscellaneous improvements and upgrades to the building’s HVAC system. All construction was completed with the remaining portions of the Boggs Chemistry Building fully occupied and operational.